Normal view MARC view ISBD view

Ictad formula method: for determining the adjustment to contract aum due to fluc

By: Institute for Construction Training and Development.
Publisher: [S.l] Institute for Construction Training and Development 1998Description: 49 p.Subject(s): Civil engineeringDDC classification: 624
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Notes Date due Barcode
Books in Stacks (S) Books in Stacks (S) Engineering Library
Science & Technology
S 624 INS (Browse shelf) Available ENG 245329

There are no comments for this item.

Log in to your account to post a comment.
© University of Jaffna