Project cost estimating (Record no. 33697)

000 -LEADER
fixed length control field 00511nam a2200193Ia 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200811115313.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180712s9999 xx 000 0 und d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 727720325
041 ## - LANGUAGE
Language of text/sound track English
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 624.1042
Author Mark PRO
DDC Edition number 23
245 ## - TITLE STATEMENT
Title Project cost estimating
Statement of responsibility, etc. / (ed. by) Nigel J. Smith
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. London
Name of publisher, distributor, etc. Thomas Telford
Date of publication, distribution, etc. 1995
300 ## - PHYSICAL DESCRIPTION
Extent 108 p. -
440 ## - SERIES STATEMENT/ADDED ENTRY--TITLE
Title Engineering management
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Engineering-estimates
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 52604
Personal name Smith, Nigel J., ed.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
item type Books in Stacks (S)
Holdings
Withdrawn status Lost status Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Source of acquisition Price Full call number Accession Number Date last seen item type
        Engineering Library Engineering Library Science & Technology 2018-07-13 Not Known 0.00 624.1042 PRO 252445 2018-07-13 Books in Stacks (S)
        Engineering Library Engineering Library Science & Technology 2018-07-16 Not Known 0.00 624.1042 PRO 252446 2018-07-16 Books in Reference (R)
© University of Jaffna